Utilities – Severn Power CCGT


FAST FACTS

Location:                               Newport, South Wales

Project Type:                        Combined Cycle Gas Turbine (CCGT)

Installed Capacity:                824 MW

Installation Period:                28 months

Partnered EPC:                     DONG Energy
Severn Power        Severn Power

 

COBALT ENERGY’S ROLE

Ian Crummack was appointed as a director of Severn Power Limited (SPL) and Severn Power Gas Transportation Limited (SGTL) from April 2009 to May 2011.

He provided contract coordination and site interface assistance from acquisition of the project by DONG Energy during construction phase through to commissioning and early operations